4 Reasons Why System Integrator & Contractor Coordination Will Enhance Managed Lane Projects

November 17, 2016      

Tags: Transportation

Three men looking at a construction site.

Managed lane projects are being developed nationwide as cost-effective congestion management relief tools. When developing an RFP, the agency should require close coordination between the toll system integrator and the design-build contractor. On many projects, the system integrator is hired under a separate contract from that of the contractor. But that could be detrimental. A coordinated approach benefits the project in four ways.

  1. The infrastructure design incorporates the system requirements.
  2. The agency’s technical requirements are met.
  3. Information is exchanged in a timely manner.
  4. Both the system integrator and contractor understand the overall project priorities.

Another important aspect of having this coordination? It maximizes the agency’s opportunity to maintain the project schedule and reduce costs.

When the agency encourages open communication, the design staff has a better understanding of the system integrator’s installation process, resulting in a more expeditious review and approval of the construction plans.

By working with the integrator, the contractor understands the toll system requirements and has the ability to highlight key concerns, working to ensure the design plans incorporate the infrastructure the system requires.

When the interim review packages are developed, the agency and stakeholders attending review meetings can more easily document issues and preferred outcomes in resolving them.

Planning

Prior to starting installation, the system integrator and contractor should meet to review the installation plan and schedule. Contact individuals can then be assigned to finalize approaches to some issues, such as:

  • Cabinet installation
  • Gantry equipment installation
  • Lane system installation
  • ITS component installation
  • Approach to power and communication connection

Construction

When construction starts, the two should prioritize the toll system needs relative to location, power communication, structures, and traffic control. By understanding the system integrator’s schedules for the different project segments, the agency can avoid conflicts by staging the system integrator’s access to the tolling point. Upon completion of each system site installation, testing can then be conducted.

Installation

This coordination involves a number of site specific components including power and communications, gantry connections and cabinet foundations, going through testing and final construction activities. Construction meetings held with the project stakeholders facilitate deliverables by both parties.

An example during toll system testing is having the contractor perform striping and final punch list work during off hours, thus allowing the system integrator roadway access to conduct their system tests.

Final Facility

In managing the individual contracts, it’s important to understand the overall project staging and how the integration of the two project staffs can be done to expedite the project schedule. When the system integrator and contractor work together and understand the overall project requirements, the resulting operations and maintenance of the facility is enhanced to meet the needs of the public.

2016-11-tin-flowchart

Figure 1 illustrates the number of areas where the responsibilities of the DBC and SI intersect.
NOTE: System Integrator (SI) is also known as Toll System Provider (TSP).

Stay in the Know

Sign up to receive RS&H and industry news, blogs, case studies, and more in our monthly newsletter.

Name
Accept GDPR Terms(Required)

Related Insights

insight
Why Risk Assessment is the Key to Project Procurement
September 13, 2023By Mike Davis, PE, DBIA

Projects inherently have risks. Some risks are high-stakes that could lead to major cost overruns or delays, while others are more minor that could lead to minor delays or changes to the scope of work.

Transportation
Photo of toll both.
insight
Mental Health in the AEC – Sympathy vs Empathy
July 18, 2023By Holly Tishfield

It starts with understanding the difference between sympathy and empathy and recognizing how these concepts can foster meaningful connections.

TransportationAviationAerospace
Woman

Developing and implementing an equitable transportation plan can gauge the needs of community members and consider how a project will affect a community’s needs for mobility and connectivity.

Transportation

Infrastructure trends that all fall within three major categories of infrastructure: funding, safety and resilience. 

TransportationAviation