Strategically located in the heart of Florida’s Northeast Biotech Cluster, Foundation Park was created to provide modern laboratories and office facilities for life science companies of all sizes and through all phases of development.
RS&H led development of the Customer Criteria Documents (CCD), including preliminary building layouts, and validated the cost estimate for a new 62,000-square-foot Squadron Operations Facility. Upon completion of the CCD, RS&H provided multidiscipline architecture and engineering design services for this new facility.
RS&H’s design team successfully addressed several areas of complexity. In addition to developing an operational layout for the unique functional areas of the building, the designers had to consider the existence of contaminated soil and potential dewatering on the project site.
When the Air Force needed its first new F-22 facilities in more than a decade as part of the permanent relocation of the F-22 Raptor Formal Training Unit (FTU) mission from Tyndall Air Force Base (AFB), FL, to Joint Base Langley-Eustis (JBLE), VA, it trusted RS&H to lead the design as part of a joint venture (JV).
To support the growing mission of the Special Forces at Joint Expeditionary Base Little Creek-Fort Story, RS&H provided multi-discipline design services for various facilities at the Naval Special Warfare Center Advanced Training Command.